Buyer Programs — Projects

For Hospitality & Retail Buyers: Project Orders, One Finish

A hotel does not buy shelves the way a store does. It buys the same shelf two hundred times, in one finish, arriving against a fit-out schedule, and then it buys the same shelf again in three years when a guest breaks one. Project buying has its own rules; this page is how we work to them.

One batch, one finish

The risk in a 200-room order is not the shelf in room one. It is the shelf in room two hundred being half a shade warmer, because the finishing run drifted across three production months. Project orders at our factory run as a single production batch wherever the schedule allows: material allocated together, finish mixed and applied as one campaign, so the minibar shelf in the first room and the bathroom shelf in the last come off the same colour record. That record is kept with the order file — which is also how a replacement piece three years later gets matched, from the batch data rather than from a photograph of a wall. Specify a spare quantity into the original order (most project buyers add a small percentage for maintenance stock) and the spares come from the same batch by definition.

What gets specified, and when

Project specifications arrive as drawings, room schedules or a designer's sample board. Solid wood pieces — a lobby console shelf, a restaurant's bottle display — are produced to order from your design, photo or sample, in paulownia and pine as standard materials, on the custom lead time of 4–8 weeks. Catalog panel shelves for rooms and bathrooms run at the standard 2–4 weeks, MOQ 500 pcs per SKU per color. Two specification points decide more projects than price does. The first is the wall: a floating shelf is only as good as its fixing, and stud, masonry and drywall rooms in the same building may need different bracket and anchor decisions — tell us the wall build-up per area. The second is humidity: bathroom and spa shelving lives wet, so the finish conversation belongs in the specification, not in the first maintenance report. We would rather spend an email on both than a shipment on either.

Retail and display

For stores, the same factory logic runs smaller: display shelving that carries merchandise rather than décor. The farmhouse guardrail pieces in our solid wood range exist because product slides off open display shelves in real shops; corner sets turn dead wall junctions into selling space. Retail buyers usually mix project and program buying — a fit-out order for a new store, then catalog reorders for replacements and rollouts — and both run on the same terms and the same colour record, so store twelve looks like store one.

Delivery against a fit-out schedule is arranged order by order: production phased to your site program, each phase packed and labelled by area where the order calls for it, shipped on the EXW and consolidation terms in shipping & incoterms. Tell us the site dates in the inquiry. A factory can hold a finished phase far more cheaply than a site can absorb a late one.

After handover: spares and the reorder file

Projects do not end at installation; they enter the years in which pieces get damaged, rooms get refreshed, and a second property wants to match the first. Two habits from the project stage pay for themselves then. The first is a spares allowance inside the original order — a small overage of the project's SKUs costs little inside a production run and saves a special short run later. The second is the reorder file: the exact SKU, finish and dimension specification of what was installed, held with your order records, so a top-up two years on is a reference number rather than a forensic exercise. Tell us at inquiry stage if the property is the first of several — a phased rollout is planned differently from a one-off fit, and the file discipline starts with the first delivery.

Specifying a project? Send the drawings or room schedule — or start with the sampling guide if your approval process needs a physical piece first.

Direct from our factory

Get wholesale pricing — and the catalog to go with it.

Wholesale pricing is quoted per inquiry, and the full product catalog is available on request. MOQ 500 pcs per SKU per color · standard lead time 2–4 weeks, custom 4–8 weeks · OEM/ODM and FBA white-label packing available.