Ordering & Export Guides

How an Order Moves: Guides for Buyers

Most factory problems are not manufacturing problems. They are sequence problems — the right question asked one stage too late. These five guides walk the order in the order it happens, so each decision lands while it is still cheap.

1 · MOQ guide

Why the floor is 500 pcs per SKU per color, what that quantity actually pays for in panel yield and finishing batches, and how buyers structure a first order that reaches the floor without betting the company on one SKU. It also settles the counting question buyers get wrong most often: sets, finishes and variants are separate lines, and the floor applies to each.

2 · Sampling guide

What a sample can prove and what it cannot. How to brief one, what to check when it lands — dimensions, finish in your light, bracket fit, a carton opened and built from — and how an approved sample becomes the standard the bulk run is judged against. It closes with the unglamorous part — how to write sample comments so the correction survives, word for word, into a production instruction.

3 · Lead times & production

Standard catalog production runs 2–4 weeks; custom work runs 4–8 weeks. What happens inside those weeks, what legitimately stretches them, and how to plan reorders backwards from a vessel date. It also names the early signals that an order is drifting, while a drift is still cheap to correct.

4 · Packaging & container loading

Flat-pack logic, export carton construction, the carton data that comes with every quotation, mixed-SKU loading photographed layer by layer, and the FCL-versus-LCL judgement in between. Freight is bought on volume and weight, so carton data is treated here as part of the price, not as packing trivia.

5 · Shipping & incoterms

EXW, FOB and DDP in plain words; why our standard quotation is EXW; and the Guangdong consolidation route — we deliver to your warehouse there, our responsibility ends at handover, and your forwarder runs everything after. Each term is defined by what changes in your workload, not by a textbook sentence.

Which guide first?

Buyers arrive with different open questions, and the sequence bends accordingly. If you are deciding whether a factory program fits your volumes at all, start with the MOQ guide — it settles feasibility before anyone spends on samples. If a physical approval gate sits inside your organisation, the sampling guide first: it defines exactly what the sample must prove, which keeps the bulk conversation short later. Working backwards from a launch date or a vessel booking, the lead-times guide is the one to annotate, because production weeks are the only part of the chain nobody can compress with money at the last minute. Comparing landed costs between two or three factories, read the packaging and incoterms guides together — carton volume and the EXW handover decide more of the true total than the unit price usually does. And if your market is the US or the EU, the compliance section belongs in the same sitting: the document set is agreed at quotation stage, and the guides assume it was.

The order, in one paragraph

An inquiry names the product, the market and the channel. We answer with a quotation — product, packaging, carton data and the document set for your market. Samples are produced and approved. The order is then fixed in writing: SKU, finish, packaging, terms. Production runs inside the quoted lead time while QC checks against the approved sample; loading is photographed; the shipment file — invoice, packing list, loading record — goes to you and your forwarder. The service pages in the Information Center cover the standing terms behind each step (payment, delivery, quality control, after-sale), and the compliance section covers the market files that sit on top for the US and EU.

MOQ 500 pcs per SKU per color Standard 2–4 weeks Custom 4–8 weeks

Already know your quantities? Skip the reading and send the inquiry — the guides will still be here when the quotation raises questions.