Lead Times: What Happens Inside 2–4 Weeks

Standard catalog production at our factory runs 2–4 weeks. Custom work runs 4–8 weeks. Neither number is a warehouse picking time — both are production windows, and this page walks through what fills them so you can plan against the real sequence.

The standard run, step by step

Material and cutting. Panels for the order are allocated and cut to the order's cutting plan — the yield logic behind our MOQ — with edges machined and bracket housings routed while the boards are still in the cutting shop. Machining and hardware fit. Bracket rods and plates are fitted and checked against the boards they will ship with; a floating shelf lives or dies on this fit, and it is checked here, not by your customer. Finishing. The order's finishes are mixed as one campaign per color and applied across the run, then cured — the step that most resists being hurried, because chemistry keeps its own schedule. Assembly and packing. Sets are assembled, hardware kits counted in, cartons formed and labelled per SKU and color, following the build in packaging & container loading. QC and release. Finished goods are checked against the approved sample and the order specification before the load is built and photographed.

On a standard run these steps overlap across the 2–4 weeks window — while one color is curing, another is being cut. That overlap is why the window is quoted as a range: a single-SKU order in a stocked finish rides the short end; a six-SKU order across three finishes, with branded packaging, rides the long end. Your quotation names the window for your configuration, and the order confirmation fixes the date the clock starts from.

Why custom work takes 4–8 weeks

A custom order — solid wood built to your design, photo or sample, or an OEM dimension that exists in no catalog — has to build its own path before walking it. Drawings are confirmed against the physical sample; jigs and tooling are set for dimensions the line has never run; materials for that design are bought in, in paulownia or pine for standard work; a first piece is produced and approved before the run is released. Each of those steps is small. Together they are the difference between 2–4 weeks and 4–8 weeks, and skipping them is how custom orders go wrong in ways that cannot be unshipped.

What stretches a timeline — honestly

Late approvals are the largest cause: a finish revised in week two, packaging artwork signed off after production has started. The fix is procedural, and it is why our sampling stage locks specification and artwork against a physical piece. Peak season is the second cause — the autumn production bulge before the holiday selling season is real, and orders placed into it queue behind orders placed before it; the countermeasure is boring and effective: place seasonal orders a cycle early. Material exceptions are the third: a non-standard species or finish can add procurement time no scheduling can remove, which is why unusual materials are settled at inquiry, not discovered at cutting.

Plan reorders backwards. Fix your selling date, subtract your forwarder's ocean and clearance time, then subtract our production window; the remainder is your latest order date, and it is earlier than intuition suggests in every season. The standing commercial steps sit in the payment and delivery sections of the Information Center.

Questions buyers ask first

When does the lead-time clock start?

When the order is confirmed in writing — specification, finish, packaging and terms fixed, and the commercial steps on the payment page completed. Approvals that arrive later (a revised finish, changed artwork) move the affected step, and we tell you by how much at the time, not at the end.

Why is custom work 4–8 weeks when standard is 2–4?

A catalog order walks a path that already exists: known cutting plans, stocked finishes, formed cartons. A custom order has to build the path first — drawing confirmation, tooling and jig setup, a first-piece approval, and materials bought for that design. The making is not slower; there is simply more of it, and none of it can be borrowed from a previous run.

Can a rush order be done?

Sometimes, and we answer honestly rather than hopefully. A rush is possible when the constraint is scheduling; it is not possible when the constraint is finishing chemistry or a material that is not in the building. Ask with your date and your SKUs — if we cannot hold the date, you will hear it before the order, not after.

Does the lead time include shipping?

No. Lead time ends at our gate (or at your Guangdong consolidation warehouse, if that is your arrangement). Ocean time, clearance and destination delivery sit with your forwarder — plan the full chain backwards from your selling date, using our production window as the first fixed block.

Working to a date? Send it with the inquiry — a date we cannot hold is one you will hear about now, while the plan can still change.